Customization: | Available |
---|---|
After-sales Service: | Warranty |
Warranty: | 1year |
Still deciding? Get samples of US$ 0/Square Meter
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Bubble Film and waste thick fabric wrapping while protecting inside seam felt.
2.Special fabric package Wrapped outside(For Air shipping).
3.Composite wooden box(sea shipping)
4.Fumigation free wooden box
5.Wooden box thickness up to 5.2cm ensure the safety of your seam felt.
The front side of the felt is the sizing surface, the felt surface has a running direction arrow, after installation in the direction of the arrow, first rinse with warm water (50-60 degrees is appropriate), and add 5-10% sodium hydroxide or detergent. After idling cleaning for 15-20 minutes, and then idling depends on the actual situation, generally in 2-3 hours, the felt can be fully soft.
The tension of the felt should not be to tight in the early stage of use, the speed should not too fast. Slow down two to three hours before putting the new felt on the machine, the test speed is between 70-80m/min, which can be raised to 90-100m/min after 24 hours, and 100-130m/min after 36 hours, then use it slowly at full speed. After using it for a week, you must clean it once.
The felt beater can only be used in the later stage of the use of the felt. To clean the felt, you must first understand the felt material. According to the principle of acid resistance but not alkali resistance of the polyester fiber, alkali resistance but not acid resistance of the nylon fiber, the detergent should be reasonably mixed. When you must use acid pickling, strictly control between 3% and 5%, and the nylon felt cannot be pickled, because the surface of the felt will be dissolved under the action of acid, so it can't be used, wash it with fresh water in time after washing, and the residual acid can be neutralized with alkali.
1. Data we need:
Paper kind
Paper GSM
Machine speed
Seam felt size
2. What is the produce cycle?
Around 50 days.
3. Payment term:
L/C, T/T, D/P